U/L Remaining - Will tell you the remaining size and percentage of data needed to be uploaded to reach a 1:1 ratio. This column uses color-codes defined in the config under Interface -> Display.
100% to 75% left = red (error color)
74% to 50% left = orange (warning color)
49% to 25% left = blue (progressbar color)
24% to 0% left = black (standard color)
Originally posted by: MercenaryForHire
U/L Remaining - Will tell you the remaining size and percentage of data needed to be uploaded to reach a 1:1 ratio. This column uses color-codes defined in the config under Interface -> Display.
100% to 75% left = red (error color)
74% to 50% left = orange (warning color)
49% to 25% left = blue (progressbar color)
24% to 0% left = black (standard color)
- M4H
Originally posted by: KeyserSoze
Found it
Enjoy fellas. All BT programs (At least the ones that I use) have the color scheme to let you know if you are getting the proper credit for your uploads, or if there are any problems with your downloads.
Hope this helps!
EDIT: Obviously M4H and I have conflicting information. I'd take KeyserSoze over this guy
KeyserSoze
Originally posted by: notfred
Originally posted by: MercenaryForHire
U/L Remaining - Will tell you the remaining size and percentage of data needed to be uploaded to reach a 1:1 ratio. This column uses color-codes defined in the config under Interface -> Display.
100% to 75% left = red (error color)
74% to 50% left = orange (warning color)
49% to 25% left = blue (progressbar color)
24% to 0% left = black (standard color)
- M4H
That's great for uploads, what's the significance for downloads?
And KeyserSoze is just plain wrong... he's looking at a totally different part of the UI.
Originally posted by: KeyserSoze
Well excuuuuuuuuuuse me. I'll never try helping again!
KeyserSoze
