These new chips were launched in April. That is, give or take, 3 months. There is still no availability, just small patches of X800Pros and 6800NUs/GTs popping up from place to place. It is August. We are rapidly approaching speed bump time.
Anyone else think it's possible the Fall Refresh will get (paper) launched before the original chips are widely available?
What kind of manufacturing problems could the big two possibly be having? I have seen no news....
Anyone else think it's possible the Fall Refresh will get (paper) launched before the original chips are widely available?
What kind of manufacturing problems could the big two possibly be having? I have seen no news....