Originally posted by: Wingznut
Thurs-Sat, and every other Wed... 12.5 hour days.
Basically... I work three days, get three off. Work four, get four off. A three day weekend is a "short weekend" for me. And a four day work week is a "long work week".
![]()
Maybe you didn't do the math... But I work 84 hours in each two week period.Originally posted by: ElFenix
Originally posted by: Wingznut
Thurs-Sat, and every other Wed... 12.5 hour days.
Basically... I work three days, get three off. Work four, get four off. A three day weekend is a "short weekend" for me. And a four day work week is a "long work week".
![]()
no wonder intel processors cost so much